Install Day Planner
Tick the work you want done and see a planning schedule from teardown to the last caulk line.

A planning schedule built from typical work. A stone top is measured first and cut afterward, so there is a wait between visits, and we give you a firm timeline before work begins.
Three quick steps
- 1Pick the bathroomA guest or powder bath, or a primary with a double.
- 2Tick the workRemoval, plumbing, vanity, top, sink, mirror and more.
- 3Read the scheduleSee the order and the hours.
About the install day planner
Is the schedule exact?
It is a planning guide built from typical work. We give you a firm timeline before work begins.
Why are there two visits with a stone top?
The top is measured first and cut afterward, so there is a gap before the install.
Can I phase the work?
Yes. Some owners start with the vanity and add the mirror and lighting later.
Services that go with this tool
Bathroom Refresh PackagesA new vanity, mirror, lights and fixtures planned as one package for a big change in a few days.See the service
Old Vanity Removal and DisposalThe old vanity disconnected, carried out and hauled away, with the floors and walls protected.See the service
Primary Bath Vanity UpgradesA bigger, better vanity wall for the room you use every morning and every night.See the service See your bathroom with a new vanity.
Call or text, or send the form to request your quote. Tell us about the bathroom and the look you want.
